SIZE:
								
								
					6 miles
								
									Client:
								
								
												Collin County
Halff provided design and construction engineering and inspection services to Collin County for a new 6-mile, two-lane southbound frontage.
The project included five major cross-street intersection designs with new traffic signals at three cross-street interchange locations. It also included an 800-foot bridge span over Doe Branch and six bridge class culverts.
							Halff Services 
 Involved
						
					- Construction Services
- Environmental
- Structural Engineering
- SUE/Utility Coordination
- Surveying
- Transportation
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.
 
                     
					 
											 
											 
											 
											 
											 
										 
										 
										 
										 
										 
                     
                    